Not surprisingly, Congress is pushing back against the Trump administration’s proposal to cancel the Space Launch System, the behemoth rocket NASA has developed to propel astronauts back to the Moon.
Spending bills making their way through both houses of Congress reject the White House’s plan to wind down the SLS rocket after two more launches, but the text of a draft budget recently released by the House Appropriations Committee suggests an openness to making some major changes to the program.
The next SLS flight, called Artemis II, is scheduled to lift off early next year to send a crew of four astronauts around the far side of the Moon. Artemis III will follow a few years later on a mission to attempt a crew lunar landing at the Moon’s south pole. These missions follow Artemis I, a successful unpiloted test flight in 2022.
After Artemis III, the official policy of the Trump administration is to terminate the SLS program, along with the Orion crew capsule designed to launch on top of the rocket. The White House also proposed canceling NASA’s Gateway, a mini-space station to be placed in orbit around the Moon. NASA would instead procure commercial launches and commercial spacecraft to ferry astronauts between the Earth and the Moon, while focusing the agency’s long-term gaze toward Mars.
CYA EUS?
House and Senate appropriations bills would preserve SLS, Orion, and the Gateway. However, the House version of NASA’s budget has an interesting paragraph directing NASA to explore cheaper, faster options for a new SLS upper stage.
NASA has tasked Boeing, which also builds SLS core stages, to develop an Exploration Upper Stage for debut on the Artemis IV mission, the fourth flight of the Space Launch System. This new upper stage would have large propellant tanks and carry four engines instead of the single engine used on the rocket’s interim upper stage, which NASA is using for the first three SLS flights.
Leave a Reply